Power Supply Cord 1.8m Schuko Cee 7/7 EU Plug Power Cable with faston
We insist within the theory of development of ‘High top quality, Performance, Sincerity and Down-to-earth working approach’ to provide you with exceptional provider of processing for Power Supply Cord 1.8m Schuko Cee 7/7 EU Plug Power Cable with faston, Sincerely hope to develop long lasting business associations along with you and we’ll do our greatest service for yourself.
We insist within the theory of development of ‘High top quality, Performance, Sincerity and Down-to-earth working approach’ to provide you with exceptional provider of processing for CEE 7-7 plug, EU Power Cord, schuko power cord, we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, we’ve got gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.
Plug | CEE 7/7 plug |
Certification | VDE |
Voltage | 250V |
Current | 16A |
Color | Black, white or customized |
Cable Length | Customized |
Jacket Material | PVC, Rubber, Cotton braided |
Conductor | Pure copper |
Cables | H03VV-F 3*0.5mm2 3*0.75mm2
H05VV-F 3*0.75mm2 3*1.0mm2 3*1.5mm2 H05RN-F 3*0.75mm2 3*1.0mm2 H07RN-F 3*1.0mm2 3*1.5mm2 H05RR-F 3*0.75mm2 3*1.0mm2 3*1.5mm2 H03RT-H 3*0.75mm2 3*1.0mm2 |
Production details:
15 years experience for manufacture. |
100% test before shipping. |
Copper conductor |
Free sample |
OEM/ODM |
PAYMENT AND DELIVERY
Payment Terms: TT, L/C.
Package Details: Standard export cartons
Lead time: 10-30 days according to the quantity.
FAQ
Q How can I get a free sample for testing?
A For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.
If you are not sure about this, just tell where it will be used, we can give some suggestion.
Q Do you have certificate for your product?
A Yes, all product are strictly according to the testing standard.
Q How long can I get the feedback after we sent enquiry?
A Within 12 hours in working days
Q What is the delivery time?
A Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.
Q What is the payment details?
A For new customers, 30% deposit will be charged for raw material preparing.
If there were any further questions, just feel free to contact us.