OEM/ODM Factory SAA Power Cord - Multinational Certification 3 Core Flexible Power Cord Cables – Handy

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our primary purpose is to give our shoppers a serious and responsible company relationship, giving personalized attention to all of them for Power Supply Cord , Argentina Power Cords , Base With Suspender Lamp , Being a young increasing organization, we might not the best, but we have been trying our best for being your very good partner.
OEM/ODM Factory SAA Power Cord - Multinational Certification 3 Core Flexible Power Cord Cables – Handy Detail:

Plug NONE
Certification SAA, VDE, UL, CCC
Voltage 200~250V, 100~125V
Current
Color Black, white or customized
Cable Length Customized
Jacket Material PVC, Rubber
Conductor copper
Cables H03VV-F 3G0.5mm2 OD5.8mm
H03VV-F 3G0.75mm2 OD6.3mm
H05VV-F 3G0.75mm2 OD6.5mm
H05VV-F 3G0.75mm2 OD6.8mm
H05VV-F 3G1.0mm2 OD7.0mm
H05VV-F 3G1.5mm2 OD8.0mm
H05VV-F 3G2.5mm2 OD9.5mmSPT-1, SPT-2, SPT-3, SVT, SJT, SJTW
18AWG, 16AWG, 14AWG, 12AWG
RVV:
0.5mm2, 0.75mm2, 1.0mm2, 1.5mm2, 2.5mm2DL3:0.75mm2, 1.0mm2, 1.5mm2

(H)VCTF:

0.75mm2, 1.25mm2, 2.0mm2

Production details:

15 years experience for manufacture.
100% test before shipping.
Copper conductor
Free sample
OEM/ODM

1 2

PAYMENT AND DELIVERY

Payment Terms: TT, L/C.

Package Details: Standard export cartons

Lead time: 10-30 days according to the quantity.

7

 FAQ

Q  How can I get a free sample for testing?

A   For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.

If you are not sure about this, just tell where it will be used, we can give some suggestion.

Q   Do you have certificate for your product?

A    Yes, all product are strictly according to the testing standard.

Q   How long can I get the feedback after we sent enquiry?

A    Within 12 hours in working days

Q   What is the delivery time?

A    Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.

Q   What is the payment details?

A    For new customers, 30% deposit will be charged for raw material preparing.

If there were any further questions, just feel free to contact us.


Product detail pictures:

OEM/ODM Factory SAA Power Cord -
 Multinational Certification 3 Core Flexible Power Cord Cables – Handy detail pictures

OEM/ODM Factory SAA Power Cord -
 Multinational Certification 3 Core Flexible Power Cord Cables – Handy detail pictures


Related Product Guide:
Wind Turbines: An eye on the technical management | VDE Cable
Takealot, Superbalist, launch big shop day | Connecting Cord

We have been commitment to supply the competitive price ,excellent products and solutions high-quality, at the same time as fast delivery for OEM/ODM Factory SAA Power Cord - Multinational Certification 3 Core Flexible Power Cord Cables – Handy, The product will supply to all over the world, such as: Finland , Swiss , Tanzania , Our product quality is one of the major concerns and has been produced to meet the customer's standards. "Customer services and relationship" is another important area which we understand good communication and relationships with our customers is the most significant power to run it as a long term business.
  • This supplier offers high quality but low price products, it is really a nice manufacturer and business partner.
    5 Stars By Erin from New Delhi - 2018.05.15 10:52
    The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
    5 Stars By Mary from Norwegian - 2017.09.29 11:19

    Related Products