OEM/ODM Factory Price 3 Pin Plug India 220V Power Cord 3 Cores Electric Cable with India Plug

Short Description:


  • Place of origin: Ningbo, China
  • Port: Shanghai/Ningbo
  • Payment term: L/C, T/T, D/A, D/P
  • Price term: FOB, CIF
  • Lead time: 10-30 days according to the quantity
  • Product Detail

    Product Tags

    Our benefits are decrease charges,dynamic income group,specialised QC,solid factories,top quality products and services for OEM/ODM Factory Price 3 Pin Plug India 220V Power Cord 3 Cores Electric Cable with India Plug, We sincerely welcome consumers from both at home and overseas to come to negotiate company with us.
    Our benefits are decrease charges,dynamic income group,specialised QC,solid factories,top quality products and services for India Power Cords, South Africa Power Cord, We always hold on the company’s principle “honest, experienced, effective and innovation”, and missions of: let all drivers enjoy their driving at night, let our employees can realize their value of life, and to be stronger and service more people. We’re determined to become the integrator of our product market and one-stop service provider of our product market.

    Plug South African 3pin plug
    Standard CE
    Voltage 200~250V
    Current 6A, 10A
    Color Black, white or customized
    Cable Length Customized
    Jacket Material PVC, Rubber
    Conductor copper
    Cables H05VV-F  3G0.75mm2  3G1.0mm2   3G1.5mm2

    Production details:

    15 years experience for manufacture.
    100% test before shipping.
    Copper conductor
    Free sample
    OEM/ODM

    1 2

    PAYMENT AND DELIVERY

    Payment Terms: TT, L/C.

    Package Details: Standard export cartons

    Lead time: 10-30 days according to the quantity.

    7

     FAQ

    Q  How can I get a free sample for testing?

    A   For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.

    If you are not sure about this, just tell where it will be used, we can give some suggestion.

    Q   Do you have certificate for your product?

    A    Yes, all product are strictly according to the testing standard.

    Q   How long can I get the feedback after we sent enquiry?

    A    Within 12 hours in working days

    Q   What is the delivery time?

    A    Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.

    Q   What is the payment details?

    A    For new customers, 30% deposit will be charged for raw material preparing.

    If there were any further questions, just feel free to contact us.


  • Previous:
  • Next:

  • Related Products