OEM Supply 3pin AC 250V 10A Power Extension Cord with China Regulations

Short Description:


  • Place of origin: Ningbo, China
  • Port: Shanghai/Ningbo
  • Payment term: L/C, T/T, D/A, D/P
  • Price term: FOB, CIF
  • Lead time: 10-30 days according to the quantity
  • Product Detail

    Product Tags

    Our well-equipped facilities and superb good quality control throughout all stages of manufacturing enables us to guarantee total buyer gratification for OEM Supply 3pin AC 250V 10A Power Extension Cord with China Regulations, Are you still on the lookout for a good quality product that is in accordance together with your very good organization image while expanding your item range? Consider our quality merchandise. Your choice will prove to be intelligent!
    Our well-equipped facilities and superb good quality control throughout all stages of manufacturing enables us to guarantee total buyer gratification for China Cable Harness, Wire Harness, You can do one-stop shopping here. And customized orders are acceptable. Real business is to get win-win situation, if possible, we would like to deliver more support for customers. Welcome all nice buyers communicate details of products and solutions and ideas with us!!

    Plug 2pin China AC plug
    Certification CCC
    Voltage 250V
    Current 6A, 10A
    Color Black, white or customized
    Cable Length Customized
    Jacket Material PVC
    Conductor copper
    Cables 227 IEC-52 (RVV)     2×0.5mm2        2×0.75mm2
    227 IEC-53 (RVV)      2×0.75mm2    2×1.0mm2

    Production details

    15 years experience for manufacture.
    100% test before shipping.
    Copper conductor
    Free sample
    OEM/ODM

    1 2

    PAYMENT AND DELIVERY

    Payment Terms: TT, L/C.

    Package Details: Standard export cartons

    Lead time: 10-30 days according to the quantity.

    7

     FAQ

    Q  How can I get a free sample for testing?

    A   For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.

    If you are not sure about this, just tell where it will be used, we can give some suggestion.

    Q   Do you have certificate for your product?

    A    Yes, all product are strictly according to the testing standard.

    Q   How long can I get the feedback after we sent enquiry?

    A    Within 12 hours in working days

    Q   What is the delivery time?

    A    Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.

    Q   What is the payment details?

    A    For new customers, 30% deposit will be charged for raw material preparing.

    If there were any further questions, just feel free to contact us.


  • Previous:
  • Next:

  • Related Products