OEM Manufacturer China European Power Cord with VDE Certification (AL-155)
It adheres on the tenet “Honest, industrious, enterprising, innovative” to acquire new solutions continuously. It regards prospects, success as its personal success. Let us build prosperous future hand in hand for OEM Manufacturer China European Power Cord with VDE Certification (AL-155), We sincerely welcome abroad clients to consult with the long-term cooperation along with the mutual growth.We strongly believe that we can do far better and far better.
It adheres on the tenet “Honest, industrious, enterprising, innovative” to acquire new solutions continuously. It regards prospects, success as its personal success. Let us build prosperous future hand in hand for China AC power cord, Power Cord, We are seeking the chances to meet all the friends from both at home and abroad for the win-win cooperation. We sincerely hope to have long-term cooperation with all of you on the bases of mutual benefit and common development.
Plug | European CEE 7/7 |
Certification | VDE |
Voltage | 250V |
Current | 16A |
Color | Black, white or customized |
Cable Length | Customized |
Jacket Material | PVC |
Conductor | copper |
Cables | H05VV-F 3*0.75mm2 H05VV-F 3*1.0mm2 H05VV-F 3*1.5mm2 |
Production details:
15 years experience for manufacture. |
100% test before shipping. |
Copper conductor |
Free sample |
OEM/ODM |
PAYMENT AND DELIVERY
Payment Terms: TT, L/C.
Package Details: Standard export cartons
Lead time: 10-30 days according to the quantity.
FAQ
Q How can I get a free sample for testing?
A For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.
If you are not sure about this, just tell where it will be used, we can give some suggestion.
Q Do you have certificate for your product?
A Yes, all product are strictly according to the testing standard.
Q How long can I get the feedback after we sent enquiry?
A Within 12 hours in working days
Q What is the delivery time?
A Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.
Q What is the payment details?
A For new customers, 30% deposit will be charged for raw material preparing.
If there were any further questions, just feel free to contact us.