ODM Supplier China 2pin Us NEMA 1-15p Plugto IEC320 C7 Connector Power Supply Cord
We now have a skilled, performance team to supply good quality services for our consumer. We often follow the tenet of customer-oriented, details-focused for ODM Supplier China 2pin Us NEMA 1-15p Plugto IEC320 C7 Connector Power Supply Cord, We are now looking forward to even greater cooperation with overseas customers based on mutual benefits. If you are interested in any of our products, please feel free to contact us for more details.
We now have a skilled, performance team to supply good quality services for our consumer. We often follow the tenet of customer-oriented, details-focused for American power cord, NEMA 1-15 power cord plug, US Power Cord, We put the product quality and customer’s benefits to the first place. Our experienced salesmen supply prompt and efficient service. Quality control group make sure the best quality. We believe quality comes from detail. If you have demand, let us work together to get success.
Plug | NEMA 1-15p |
Certification | UL/CSA |
Voltage | 100~125V |
Current | 10A, 13A, 15A |
Color | Black, white or customized |
Cable Length | Customized |
Material | PVC |
Conductor | copper |
Cables | SVT 18AWG/2C SJT SJTW 18-16-14AWG/2C |
Production details:
15 years experience for manufacture. |
100% test before shipping. |
Copper conductor |
Free sample |
OEM/ODM |
PAYMENT AND DELIVERY
Payment Terms: TT, L/C.
Package Details: Standard export cartons
Lead time: 10-30 days according to the quantity.
FAQ
Q How can I get a free sample for testing?
A For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.
If you are not sure about this, just tell where it will be used, we can give some suggestion.
Q Do you have certificate for your product?
A Yes, all product are strictly according to the testing standard.
Q How long can I get the feedback after we sent enquiry?
A Within 12 hours in working days
Q What is the delivery time?
A Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.
Q What is the payment details?
A For new customers, 30% deposit will be charged for raw material preparing.
If there were any further questions, just feel free to contact us.