ODM Manufacturer China Australian Power Cord with 3 Pins Plug and C13 Connector
To become the stage of realizing dreams of our employees! To build a happier, additional united and additional experienced team! To reach a mutual gain of our clients, suppliers, the society and ourselves for ODM Manufacturer China Australian Power Cord with 3 Pins Plug and C13 Connector, We have assured that we could present the top quality solutions at resonable rate, excellent after-sales assistance into the prospects. And we’ll create a brilliant potential.
To become the stage of realizing dreams of our employees! To build a happier, additional united and additional experienced team! To reach a mutual gain of our clients, suppliers, the society and ourselves for AC Power Cord, China Extension Leads, Our items have enjoyed a great reputation for their good quality, competitive prices and prompt shipment in international market. Presently, we’re sincerely looking forward to cooperating with more overseas customers based on mutual benefits.
Plug | 3pin Australia to C13 |
Certification | SAA |
Voltage | 200~250V |
Current | 10A |
Color | Black, white or customized |
Cable Length | Customized |
Jacket Material | PVC |
Conductor | copper |
Cables | DL3 4V-75 3×0.75mm2
DL3 4V-75 3×1.0mm2 DL3 4V-75 3×1.5mm2 |
Production details:
15 years experience for manufacture. |
100% test before shipping. |
Copper conductor |
Free sample |
OEM/ODM |
PAYMENT AND DELIVERY
Payment Terms: TT, L/C.
Package Details: Standard export cartons
Lead time: 10-30 days according to the quantity.
FAQ
Q How can I get a free sample for testing?
A For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.
If you are not sure about this, just tell where it will be used, we can give some suggestion.
Q Do you have certificate for your product?
A Yes, all product are strictly according to the testing standard.
Q How long can I get the feedback after we sent enquiry?
A Within 12 hours in working days
Q What is the delivery time?
A Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.
Q What is the payment details?
A For new customers, 30% deposit will be charged for raw material preparing.
If there were any further questions, just feel free to contact us.