New Arrival China China UK 3-Pin Power Cord with VDE Certificate

Short Description:


  • Place of origin: Ningbo, China
  • Port: Shanghai/Ningbo
  • Payment term: L/C, T/T, D/A, D/P
  • Price term: FOB, CIF
  • Lead time: 10-30 days according to the quantity
  • Product Detail

    Product Tags

    We emphasize enhancement and introduce new solutions into the market just about every year for New Arrival China China UK 3-Pin Power Cord with VDE Certificate, Our Company Core Principle: The prestige first ;The quality guarantee ;The customer are supreme.
    We emphasize enhancement and introduce new solutions into the market just about every year for BS Power Cord, China UK Power Cord, We confirm to public, cooperation, win-win situation as our principle, adhere to the philosophy of make a living by quality, keep developing by honesty , sincerely hope to build up a good relationship with more and more customers and friends, to achieve a win-win situation and common prosperity.

    Plug 3pin China AC plug
    Certification CCC
    Voltage 250V
    Current 6A,10A,16A
    Color Black, white or customized
    Cable Length Customized
    Jacket Material PVC/Rubber
    Conductor copper
    Cables 3×0.5mm2  3×0.75mm2    3×1.0mm2   3×1.5mm2

    Production details:

    15 years experience for manufacture.
    100% test before shipping.
    Copper conductor
    Free sample
    OEM/ODM

    1 2

    PAYMENT AND DELIVERY

    Payment Terms: TT, L/C.

    Package Details: Standard export cartons

    Lead time: 10-30 days according to the quantity.

    7

     FAQ

    Q  How can I get a free sample for testing?

    A   For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.

    If you are not sure about this, just tell where it will be used, we can give some suggestion.

    Q   Do you have certificate for your product?

    A    Yes, all product are strictly according to the testing standard.

    Q   How long can I get the feedback after we sent enquiry?

    A    Within 12 hours in working days

    Q   What is the delivery time?

    A    Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.

    Q   What is the payment details?

    A    For new customers, 30% deposit will be charged for raw material preparing.

    If there were any further questions, just feel free to contact us.


  • Previous:
  • Next:

  • Related Products