Fast delivery Ccc Approved Power Cord - Drop Light with switch – Handy
Fast delivery Ccc Approved Power Cord - Drop Light with switch – Handy Detail:
1. Widely used in commercial lighting and decoration, landscape setting and private atmosphere creating such as porch, wedding reception, birthday or cocktail party.
2. Flexible customization: bulbs spaced 2 feet apart or customized. Can be connected up to 10 strands end to end.
3. Smart Control: APP or Voice control, with color modulation, give more than 100 color combinations.
Cable Spercification | |||
Cable Length: | 24FT (7.31 meters), 48FT (14.6 meters), OR Customized | ||
Cable Color: | Black, White, Pink or Customized | ||
IP Rating: | IP65 | ||
Cable Jacket: | PVC, Rubber | ||
Lights | |||
Bulb Material: | Glass, Plastic | ||
Power: | 1W, 2W, 4W, 6W, 8W | ||
Color Temp: | Yellow, Warm white, White | ||
Base: | E26, E27 | ||
Packing for Reference | |||
SJTW 16/3, 12pcs Holders, 24FT | H05RN-F 2*1.0mm, 12pcs Holders,24FT | ||
Color/Blank box size | 400*240*229mm | Color/Blank box size | 375*210*200mm |
Out Carton | size: 420*500*485mm | Out Carton | size: 400*450*425mm |
packing rate: 4pcs/CTN | packing rate: 4pcs/CTN | ||
G.W.: 12 KGS | G.W.: 12 KGS | ||
20′/40′/40H Container | 1064/2208/2436 sets | 20′/40′/40H Container | 1464/3032/3348 sets |
Production details:
15 years experience for manufacture. |
100% test before shipping. |
Copper conductor |
OEM/ODM |
PAYMENT AND DELIVERY
Payment Terms: TT, L/C.
Package Details: Standard export cartons
Lead time: 10-30 days according to the quantity.>
FAQ
Q How can I get a free sample for testing?
A For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.
If you are not sure about this, just tell where it will be used, we can give some suggestion.
Q Do you have certificate for your product?
A Yes, all product are strictly according to the testing standard.
Q How long can I get the feedback after we sent enquiry?
A Within 12 hours in working days
Q What is the delivery time?
A Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.
Q What is the payment details?
A For new customers, 30% deposit will be charged for raw material preparing.
If there were any further questions, just feel free to contact us.
Product detail pictures:
Related Product Guide:
HELUKABEL to showcase aluminum cable connection technology at WINDPOWER 2013 | Solar String Light
PV – ABB technology powers soccer club?s Skagerak Arena in Norway | Solar String Light
With sophisticated technologies and facilities, strict top quality handle, reasonable value, exceptional support and close co-operation with clients, we are devoted to furnishing the ideal worth for our clients for Fast delivery Ccc Approved Power Cord - Drop Light with switch – Handy, The product will supply to all over the world, such as: Jordan , Doha , Sheffield , Actually need to any of those objects be of interest to you, make sure you allow us to know. We'll be delighted to present you a quotation on receipt of one's comprehensive specs. We've our individual specialist R&D enginners to meet any of the requriements, We look forward to receiving your enquires soon and hope to have the chance to work together with you inside the future. Welcome to take a look at our organization.
By Arthur from Indonesia - 2018.02.04 14:13
In China, we have many partners, this company is the most satisfying to us, reliable quality and good credit, it is worth appreciation.
By Janice from Madagascar - 2017.10.25 15:53