Factory supplied China UL Approval Us 3 Pins NEMA5-15p AC Power Cord Factory

Short Description:


  • Place of origin: Ningbo, China
  • Port: Shanghai/Ningbo
  • Payment term: L/C, T/T, D/A, D/P
  • Price term: FOB, CIF
  • Lead time: 10-30 days according to the quantity
  • Product Detail

    Product Tags

    We always do the job to be a tangible group making sure that we can provide you with the top top quality as well as ideal value for Factory supplied China UL Approval Us 3 Pins NEMA5-15p AC Power Cord Factory, Welcome to visit us at any time for organization marriage established.
    We always do the job to be a tangible group making sure that we can provide you with the top top quality as well as ideal value for AC Power Cord, China Power Cord Factory, Our company has already have pass the ISO standard and we are fully respect our customer ‘s patents and copyrights. If the customer provides their own designs, We will guarantee that they will likely be the only one can have that goods. We hoping that with our good solutions can bring our customers a great fortune.

    Plug NEMA 6-15p
    Certification UL/CSA
    Voltage 100~125V
    Current 10A, 13A, 15A
    Color Black, white or customized
    Cable Length Customized
    Jacket Material PVC
    Conductor copper
    Cables SPT-2  SPT-3 18AWG/3C
    SVT 18AWG/3C
    SJT SJTW 18-16-14AWG/3C

    Production details

    15 years experience for manufacture.
    100% test before shipping.
    Copper conductor
    Free sample
    OEM/ODM

    1 2

     PAYMENT AND DELIVERY   

    Payment Terms: TT, L/C.

    Package Details: Standard export cartons

    Lead time: 10-30 days according to the quantity.

    7

     FAQ

    Q  How can I get a free sample for testing?

    A   For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.

    If you are not sure about this, just tell where it will be used, we can give some suggestion.

    Q   Do you have certificate for your product?

    A    Yes, all product are strictly according to the testing standard.

    Q   How long can I get the feedback after we sent enquiry?

    A    Within 12 hours in working days

    Q   What is the delivery time?

    A    Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.

    Q   What is the payment details?

    A    For new customers, 30% deposit will be charged for raw material preparing.

    If there were any further questions, just feel free to contact us.


  • Previous:
  • Next:

  • Related Products