Factory making China Kc Power Cords& Korea Electrical Outlets (S03-B-K+ST3-W)

Short Description:


  • Place of origin: Ningbo, China
  • Port: Shanghai/Ningbo
  • Payment term: L/C, T/T, D/A, D/P
  • Price term: FOB, CIF
  • Lead time: 10-30 days according to the quantity
  • Product Detail

    Product Tags

    We will devote ourselves to supplying our esteemed prospects while using the most enthusiastically considerate providers for Factory making China Kc Power Cords& Korea Electrical Outlets (S03-B-K+ST3-W), We look forward to determine a long-term organization marriage with your esteem co-operation.
    We will devote ourselves to supplying our esteemed prospects while using the most enthusiastically considerate providers for China Kc Power Cords, Korea Electrical Outlets& Power Cords, now we have 8 years experience of production and 5 years experience in trading with the customers all over the world. our clients mainly distributed in the North America, Africa and Eastern Europe. we can supply high quality products with the very competitive price.

    Plug Korean 3pin plug
    Standard KC
    Voltage 250V
    Current 16A
    Color Black, white or customized
    Cable Length Customized
    Jacket Material PVC, Rubber
    Conductor copper
    Cables H05VV-F  3×0.75mm2   3×1.0mm2    3×1.5mm2

    Production details:

    15 years experience for manufacture.
    100% test before shipping.
    Copper conductor
    Free sample
    OEM/ODM

    1 2

    PAYMENT AND DELIVERY

    Payment Terms: TT, L/C.

    Package Details: Standard export cartons

    Lead time: 10-30 days according to the quantity.

    7

     FAQ

    Q  How can I get a free sample for testing?

    A   For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.

    If you are not sure about this, just tell where it will be used, we can give some suggestion.

    Q   Do you have certificate for your product?

    A    Yes, all product are strictly according to the testing standard.

    Q   How long can I get the feedback after we sent enquiry?

    A    Within 12 hours in working days

    Q   What is the delivery time?

    A    Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.

    Q   What is the payment details?

    A    For new customers, 30% deposit will be charged for raw material preparing.

    If there were any further questions, just feel free to contact us.


  • Previous:
  • Next:

  • Related Products