Factory making China 10A 15A Australian Heavy Duty Power Cables Cord SAA

Short Description:


  • Place of origin: Ningbo, China
  • Port: Shanghai/Ningbo
  • Payment term: L/C, T/T, D/A, D/P
  • Price term: FOB, CIF
  • Lead time: 10-30 days according to the quantity
  • Product Detail

    Product Tags

    “Control the standard by the details, show the energy by quality”. Our enterprise has strived to establish a hugely efficient and stable staff members staff and explored an effective good quality control procedure for Factory making China 10A 15A Australian Heavy Duty Power Cables Cord SAA, Our company quickly grew in size and name because of its absolute dedication to superior quality manufacturing, large value of goods and great customer provider.
    “Control the standard by the details, show the energy by quality”. Our enterprise has strived to establish a hugely efficient and stable staff members staff and explored an effective good quality control procedure for Australia Power Cord, Australian plug, Austrlian power cable, Due to our dedication, our goods are well known throughout the world and our export volume continuously grows every year. We will continue to strive for excellence by providing high quality items that will exceed the expectation of our customers.

    Plug 3pin Australia to C13
    Certification SAA
    Voltage 200~250V
    Current 10A
    Color Black, white or customized
    Cable Length Customized
    Jacket Material PVC
    Conductor copper
    Cables DL3  4V-75    3×0.75mm2

    DL3  4V-75    3×1.0mm2

    DL3  4V-75    3×1.5mm2

    Production details:

    15 years experience for manufacture.
    100% test before shipping.
    Copper conductor
    Free sample
    OEM/ODM

    1 2

    PAYMENT AND DELIVERY

    Payment Terms: TT, L/C.

    Package Details: Standard export cartons

    Lead time: 10-30 days according to the quantity.

    7

     FAQ

    Q  How can I get a free sample for testing?

    A   For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.

    If you are not sure about this, just tell where it will be used, we can give some suggestion.

    Q   Do you have certificate for your product?

    A    Yes, all product are strictly according to the testing standard.

    Q   How long can I get the feedback after we sent enquiry?

    A    Within 12 hours in working days

    Q   What is the delivery time?

    A    Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.

    Q   What is the payment details?

    A    For new customers, 30% deposit will be charged for raw material preparing.

    If there were any further questions, just feel free to contact us.


  • Previous:
  • Next:

  • Related Products