Factory For China Ktl/Kc Certificate Korea Power Cable/ Korean Plug 2 Pin Plug 10A Plug
In order to greatest fulfill client’s requires, all of our operations are strictly performed in line with our motto “High Quality, Aggressive Selling price, Fast Service” for Factory For China Ktl/Kc Certificate Korea Power Cable/ Korean Plug 2 Pin Plug 10A Plug, “Passion, Honesty, Sound support, Keen cooperation and Development” are our plans. We’ve been here anticipating good friends all around the globe!
In order to greatest fulfill client’s requires, all of our operations are strictly performed in line with our motto “High Quality, Aggressive Selling price, Fast Service” for China Korea Power Cable, Ktl/Kc Certificate Korea Power Cable/ Korean Pl, We have been persisting in the business essence “Quality First, Honoring Contracts and Standing by Reputations, providing customers with satisfying merchandise and service. ” Friends both at home and abroad are warmly welcome to establish everlasting business relations with us.
Plug | Korean 3pin plug |
Standard | KC |
Voltage | 250V |
Current | 16A |
Color | Black, white or customized |
Cable Length | Customized |
Jacket Material | PVC, Rubber |
Conductor | copper |
Cables | H05VV-F 3×0.75mm2 3×1.0mm2 3×1.5mm2 |
Production details:
15 years experience for manufacture. |
100% test before shipping. |
Copper conductor |
Free sample |
OEM/ODM |
PAYMENT AND DELIVERY
Payment Terms: TT, L/C.
Package Details: Standard export cartons
Lead time: 10-30 days according to the quantity.
FAQ
Q How can I get a free sample for testing?
A For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.
If you are not sure about this, just tell where it will be used, we can give some suggestion.
Q Do you have certificate for your product?
A Yes, all product are strictly according to the testing standard.
Q How long can I get the feedback after we sent enquiry?
A Within 12 hours in working days
Q What is the delivery time?
A Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.
Q What is the payment details?
A For new customers, 30% deposit will be charged for raw material preparing.
If there were any further questions, just feel free to contact us.