Factory Cheap China European Cee7 Standard Sheet Xvii Iec884-1 AC Power Cord (HDB002)

Short Description:


  • Place of origin: Ningbo, China
  • Port: Shanghai/Ningbo
  • Payment term: L/C, T/T, D/A, D/P
  • Price term: FOB, CIF
  • Lead time: 10-30 days according to the quantity
  • Product Detail

    Product Tags

    The key to our success is “Good Solution Top quality, Reasonable Value and Efficient Service” for Factory Cheap China European Cee7 Standard Sheet Xvii Iec884-1 AC Power Cord (HDB002), We, with open arms, invite all interested buyers to visit our website or contact us directly for further information.
    The key to our success is “Good Solution Top quality, Reasonable Value and Efficient Service” for AC Power Cord, China Power Cord, Each customer’s satisfactory is our goal. We’ve been looking for long-term cooperation with each customer. To meet this, we keep up our quality and give extraordinary customer service. Welcome to our company, we are expecting to cooperate with you.

    Plug 2pin European AC plug
    Certification VDE
    Voltage 250V
    Current 2.5A
    Color Black, white or customized
    Cable Length Customized
    Jacket Material PVC
    Conductor copper
    Cables H03VVH2-F 2*0.5mm2 2*0.75mm2
    H05VVH2-F 2*0.75mm2 2*1.0mm2
    H03VV-F  2×0.5mm2   2×0.75mm2
    H05VV-F  2×0.75mm2
    H03RT-H  2×0.75mm2

    Production details:

    15 years experience for manufacture.
    100% test before shipping.
    Copper conductor
    Free sample
    OEM/ODM

    1 2

    PAYMENT AND DELIVERY

    Payment Terms: TT, L/C.

    Package Details: Standard export cartons

    Lead time: 10-30 days according to the quantity.

    7

     FAQ

    Q  How can I get a free sample for testing?

    A   For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.

    If you are not sure about this, just tell where it will be used, we can give some suggestion.

    Q   Do you have certificate for your product?

    A    Yes, all product are strictly according to the testing standard.

    Q   How long can I get the feedback after we sent enquiry?

    A    Within 12 hours in working days

    Q   What is the delivery time?

    A    Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.

    Q   What is the payment details?

    A    For new customers, 30% deposit will be charged for raw material preparing.

    If there were any further questions, just feel free to contact us.


  • Previous:
  • Next:

  • Related Products