Chinese Professional China VDE Approved Euro Schuko 3-Pin Power Cord with C13 C15 C7 C5 Connector

Short Description:


  • Place of origin: Ningbo, China
  • Port: Shanghai/Ningbo
  • Payment term: L/C, T/T, D/A, D/P
  • Price term: FOB, CIF
  • Lead time: 10-30 days according to the quantity
  • Product Detail

    Product Tags

    We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Chinese Professional China VDE Approved Euro Schuko 3-Pin Power Cord with C13 C15 C7 C5 Connector, Should even more info be required, remember to make contact with us at any time!
    We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Euro Power Cord, H03vvh2-F Power Cable, We now have to continue to uphold the “quality, detailed, efficient” business philosophy of “honest, responsible, innovative”spirit of service, abide by the contract and abide by reputation, first-class goods and improve service welcome overseas customers patrons.

    Plug CEE 7-16 to IEC320 C7
    Certification VDE
    Voltage 200~250V
    Current 2.5A
    Color Black, white or customized
    Cable Length Customized
    Jacket Material PVC
    Conductor copper
    Cables H03VVH2-F 2*0.5mm2 2*0.75mm2
    H05VVH2-F 2*0.75mm2 2*1.0mm2H03VV-F  2×0.5mm2   2×0.75mm2

    H05VV-F  2×0.75mm2

    Production details:

    15 years experience for manufacture.
    100% test before shipping.
    Copper conductor
    Free sample
    OEM/ODM

    1 2

    PAYMENT AND DELIVERY

    Payment Terms: TT, L/C.

    Package Details: Standard export cartons

    Lead time: 10-30 days according to the quantity.

    7

     FAQ

    Q  How can I get a free sample for testing?

    A   For standard power cord, please tell us your require data: such as cable length, plug type, cable color or tail end type.

    If you are not sure about this, just tell where it will be used, we can give some suggestion.

    Q   Do you have certificate for your product?

    A    Yes, all product are strictly according to the testing standard.

    Q   How long can I get the feedback after we sent enquiry?

    A    Within 12 hours in working days

    Q   What is the delivery time?

    A    Normally 23~28 days after received deposit. detail delivery date will depend on the production season and order quantity.

    Q   What is the payment details?

    A    For new customers, 30% deposit will be charged for raw material preparing.

    If there were any further questions, just feel free to contact us.


  • Previous:
  • Next:

  • Related Products